Our Work

Graphics Design & IT

  1. March, 2015_ Virigin Oil Company, Antivirus Installation, Back of PC & Network work failure & printer failure, Sticker redesign. ($750.00)
  2. Feb 2015, Bruela Company Logo Design ($100.00)

Building Design (CAD Drafting 2d)

  1. June, 2015 Catholic Hall Uma Village Redesign of Wall Structures & Beam Details provided in 2D detail drawing (Volunter Basics)
  2. August, 2015 3D Building Design relastic Presentation provided to clients on Kiribati Islanders. (Soft: Chief Architect & AutoCAD Architecture)
  3. 3D Structural Detailing & Quantity Take off Demo towards Snr. Engineer Structure – Mr. Netani Kau (Actg.) 1st Floor Civic Administration Bldg
  4. Quantity Take of foundation 40 by 30 feet that cost overall of $2,500. Methodist Savutalele Commitee Tamavua, Fiji.
  5. Electrical Design of Quantity Take off (house plans of Electrical Design & Quantity) 15th Feb, 2016. 1 client already.

Civil Design (2d CAD Drafting & Design)

  1. July 2013, Topographical Design of Walu Bay fmf design of contours & levels for construction documents, ( Construstion Equipment Hire Ltd, Nadi)
  2. April 2015, Consultation of Proposed Hydro Design 25kw costs ($650,000 FjD) Approval will done by Regiestred Engineers.
  3. Scheme Design Project for Thomas Veisau (Ministry of Lands Department fiji) for Regiestred Surveyors Apporval